District Hospital Delitzsch
Based on the proposals of a Master Plan the Hospital with 172 beds was extended, conflated and modernised in two Phases.
Essential functional and care departments were redesigned, among them, the emergency department, ICU, central sterilisation, laboratory, physiotherapy, operating theatres, radiology and wards.

Investment: 38 mn. EUR
Consultancy Fee: 3,0 mn EUR
Capacity: 172 Beds
Gross Floor Area: 10,400.00 sqm

Our achievements

  • Base estimates
  • Preliminary design and cost estimation
  • Design documentation and cost accounting
  • Application for permit
  • Detailed design
  • Preparation of the placing

This project was realised by me as employee of the top consult köln GmbH.